OPERATION #3 NOW COMPLETE ON THE DERRINGER CASES

We have completed Op #3 which machines the outside of the opposite case now on all of our engine blocks. Next the case halves are assembled into a match pair and will go to the Haas for Line Boring to ensure that the crankshaft is aligned perfectly in the engine block.

JV

About the author

Leave a Reply

Your email address will not be published. Required fields are marked *